|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Springtime on the Sunshine coast... |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Stump on the low water portage |
|
|
--- |
|
|
  |
|
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Finishing the handrail posts |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Unloading the concrete mix |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Roger preparing the corbel |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Preparing for #3 stringer |
|
|
--- |
|
|
  |
Bracing done, finishing the gable... |
|
|
--- |
|
|
  |
Roger with the finishing touches |
|
|
--- |
|
|
  |
Rieveley's Pond shelter SCT |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Stringers ready for decking |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Old bridge out, ready for the new |
|
|
--- |
|
|
  |
Bob doing his best work while sitting... |
|
|
--- |
|
|
  |
Drilling to pin the crosstie |
|
|
--- |
|
|
  |
Old footbridge in need of replacement |
|
|
--- |
|
|
  |
Roger ready for our Xmas lunch |
|
|
--- |
|
|
  |
Temp safety rope in place |
|
First sheet of the metal roofing |
|
|
--- |
|
|
  |
Bob S. & Richie, peelers ! |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
End of Okeover from Bunster Bluffs |
|
Squirrel Crossing 2010 rebuild |
|
|
--- |
|
|
  |
Plummer Creek bridge rebuilt |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Almost ready for the metal roofing |
|
|
--- |
|
|
  |
Debris on the low water portage |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
John testing our new blower |
|
|
--- |
|
|
  |
Completed bridge at Dinner Rock... |
|
|
--- |
|
|
  |
Bueno Notches rebuilt Feb 2011 |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Fitting the lower cross-piece |
|
Harwood Island from Bunster Bluffs |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Upper Toquenatch Creek footbridge... |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Steps to loft & picnic table ready |
|
|
--- |
|
|
  |
Lang Creek complete - ready to... |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
High water damage Roger's Roost... |
|
|
--- |
|
|
  |
Xmas goodies, hot dogs & Christmas... |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
First stringer ready to drop |
|
|
--- |
|
|
  |
Finishing the roofing metal |
|
|
--- |
|
|
  |
Wood prep for Salmon Soc. signs |
|
|
--- |
|
|
  |
Roger's Roost high water damage |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Joe cleaning the boardwalk |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Robert draining the swamp |
|
|
--- |
|
|
  |
Presenting a bowl made by John... |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
West end poured & floated |
|
|
--- |
|
|
  |
'Boot tree' on the Trinket trail |
|
|
--- |
|
|
  |
LBA's Stone Slinger delivering... |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Springtime at the Rieveley's Pond... |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
David Lam Falls deck rebuild 2010 |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
3rd & 4th stringers ready |
|
|
--- |
|
|
  |
Clearing centre pier area |
|
|
--- |
|
|
  |
Lang Creek handrails finished |
|
|
--- |
|
|
  |
Niels making a presentation to... |
|
|
--- |
|
|
  |
|
|
--- |
|
|
  |
Roger building an outhouse door |
|
|